WellTest Operations

(Click "Pop Out" button at top right of images to view, print or save full size document)

QAQC Checklists


Prior to mobilising equipment, where possible, it is a good idea to visit vendors premises to inspect equipment & ensure the equipment meets the requested specifications & requirements of the planned operations. The checks in the documents are by no means exhaustive, they may not all be relevant for the perticular piece of equipment being mobilised, however, they will give an indication of the type of checks or questions that can be asked to give conifdence in pre-mobilisation QA/QC assurance. Particularly useful if inspecting equipment you are unfamiliar with.

WellTest Equipment


Checklists for equipment such as:



Surafce Test Tree

Pumps & Control Panels

ESD System

Coflexip Hoses

Pipework Package

SSV

Sand Filters

Choke Manifold

Heat Exchanger

Steam Generator

A60 Cabin

Test Separator

Surge Tank

Transfer Pump

Water Filtration System

Burner Booms

Burners

Compressors

Ancilliary Equipment


Pre-mobilisation checklists for equipment including:


Pumps & Control Panels

Pipework Packages

Air Supply Packages

Pressure Test Equipment

Hand Tools

Lifting & Securing Equipment

Chemicals

Workshop Containers

Air Compressors