Prior to mobilising equipment, where possible, it is a good idea to visit vendors premises to inspect equipment & ensure the equipment meets the requested specifications & requirements of the planned operations. The checks in the documents are by no means exhaustive, they may not all be relevant for the perticular piece of equipment being mobilised, however, they will give an indication of the type of checks or questions that can be asked to give conifdence in pre-mobilisation QA/QC assurance. Particularly useful if inspecting equipment you are unfamiliar with.
Pre-mobilisation checklists for equipment including:
Gooseneck
Injector Head
Stripper / Stuffing Box
Power Pack
Control Cabin
Coiled Tubing Reel
Coiled Tubing
BOP's
Coiled Tubing Lift Frame
Pre-mobilisation checklists for equipment including:
Connectors
Motor Head Assembly
Stabilisers
Straight Bars
Jetting Nozzle
Venturi Junk Basket
Accelerators
Jars
PDM Motor
Xovers
GS & JDC Pulling Tools
BHA Handling Gear
Mills & Shoes
Pre-mobilisation checklists for equipment including:
Pumps & Control Panels
Pipework Packages
Air Supply Packages
Pressure Test Equipment
Hand Tools
Lifting & Securing Equipment
Chemicals
Workshop Containers
Air Compressors
Copyright © 2021 CWI Applications Ltd