Completion Operations

(Click "Pop Out" button at top right of images to view, print or save full size document)

QAQC Checklists


Prior to mobilising equipment, where possible, it is a good idea to visit vendors premises to inspect equipment & ensure the equipment meets the requested specifications & requirements of the planned operations. The checks in the documents are by no means exhaustive, they may not all be relevant for the perticular piece of equipment being mobilised, however, they will give an indication of the type of checks or questions that can be asked to give conifdence in pre-mobilisation QA/QC assurance. Particularly useful if inspecting equipment you are unfamiliar with.

Completion Equipment (Intermediate)


Completion make-up checklists for equipment including:


Worksite & Equipment

Liner Hanger / Packer

Tubing Xover

Reservoir Isolation Plug / Valve

WEG / SAG / SAM




Completion Equipment (Lower)


Completion make-up checklists for equipment including:


Worksite & Equipment

Liner Hanger / Packer

Tubing Xover

Sand Screens

Swellable Packers

Drillable Pack Off Bushing

Slick Stinger

Gravel Pack Valve

Washpipe

Delayed Opening Ball Seat / Swivel

Reservoir Isolation Plug / Valve

Reamer / Bullnose



Completion Equipment (Upper)


Completion make-up checklists for equipment including:


Worksite & Equipment

Tubing Hanger

TRSSSV

Control Line Spooler

Side Pocket Mandrel

Gauge Mandrel

Sliding Side Door

Polished Bore Recepticle

Production Packer

Tubing Xover

WEG / SAG / SAM



Ancilliary Equipment


Pre-mobilisation checklists for equipment including:


Pumps & Control Panels

Pipework Packages

Air Supply Packages

Pressure Test Equipment

Hand Tools

Lifting & Securing Equipment

Chemicals

Workshop Containers

Air Compressors